Immigrant Reception Unit. Construction of E.E.L. Type Compact Unit with MBBR technology. Processing capacity: 1500 i.p. / 225 m3/day Implementation Period: 2021
Immigrant Reception Unit. Construction of E.E.L. Type Compact Unit with MBBR technology. Processing capacity: 1500 i.p. / 225 m3/day Implementation Period: 2021
Construction of a Compact Wastewater Treatment Plant (MBR) Processing capacity: 50 m3/day Implementation Period: 2021
Ε.Ε.Λ. MUNICIPALITY OF PINIO (VARTHOLOMIOU-GASTOUNIS) Functional completion of an urban wastewater treatment plant.
Upgrading and modernization of the Wastewater Treatment Plant (WWTP) of D. Erymanthia, in order to cope with the treatment of wastewater produced by residents, services and slaughterhouses of the Municipality, so that the treated ones are within the specifications for disposal in the torrent Kalimpaki.
Supply and Installation of E / M Dehydration Equipment (D5982), at the Water Treatment Plant (MEN) of Aspropyrgos
Revamping of WWTP and sludge processing and disposal sections.
Construction of WWTP for wastewater treatment at Industrial Area of Thisvi in Voiotia to serve all of its employees’ needs. (Maximum population of 700 people). The study and design of the plant was to allow the expansion of the facility in the future depending on the development of the Industrial Zone Method of treatment is the activated […]